MALAY BOOSTER COMPRESSOR STATION, TURKMENISTAN

 
 

Project Description:

1. Gas flow: 45 MMCMD

2. Dresser Rand/GE Turbine Driven Gas Compressor Units, 32 MW each, configuration 2+1 for Yard A and 2+1 for Yard B

 

Scope of Work: Engineering Survey, Basic Design, Detail Engineering

Client: ENEX

Execution period: 2012 – 2015