DOVLETABAD-2 BOOSTER COMPRESSOR STATION, TURKMENISTAN

 
 

Project Description:

1. Gas flow: 50 MMCMD

2. Dresser Rand/GE Turbine Driven Gas Compressor Units, 32 MW each, configuration: 2+1

 

Scope of Work: Engineering Survey, Basic Design, Detail Engineering, Procurement and Construction management, Commissioning and start-up

Client: ENEX

Execution period: 2010 – 2012