DOVLETABAD-3 BOOSTER COMPRESSOR STATION, TURKMENISTAN

 
 

Project Description:

1. Gas flow: 60 MMSCMD

2. Dresser Rand Compressors, GE Turbines. Three Turbine Driven Gas Compressor Units, 32 MW each (total: 96 MW)

 

Scope of Work: Engineering Survey, Basic Design, Detail Engineering, Procurement Service, Construction management, Commissioning and Start-up

Client: ENEX

Execution period: 2006 – 2007