Category: English Projects
Published on Wednesday, 16 January 2013 09:55
Written by Super User
Hits: 1630

PROCESSING COMPLEX FOR THE YURI KORCHAGIN OFFSHORE ICE-RESISTANT PLATFORM (LSP-1), THE CASPIAN SEA, RUSSIAN FEDERATION

 
 

Project description:

1. Crude Oil treatment plant with capacity of 329 m3/hr

2. Oil transportation systems

3. Produced water treatment systems

4. Gas treatment plant (dehydration, drying) 

5.  Gas compressor stations (HP and LP compressors): 2 low-pressure compressors 2,2 МW each, 3 high-pressure compressors 4,2 МW each

6. Power generation station: 4 gas turbo-generators Solar GG, 6.4 MW each, total - 26 MW

Scope of Work: Basic Design (FEED) updating, Detail

Engineering, As-Built Documentation, Procurement

Service, Supervising, Pre-commissioning, 

Commissioning, Operation Procedures.

Client: LUKOIL

Execution period: 2008 – 2010